Project 19

CCCC Fourth Harbor Engineering Aluminum Alloy Sacrificial Anode Project

Aluminum alloy sacrificial anodes and connection accessories are supplied for the metallic structures and installation points involved in this project. Anode arrangement, installation connections and potential testing are organized around the operating medium, installation position and site construction conditions.

CCCC Fourth Harbor Engineering Aluminum Alloy Sacrificial Anode Project project site
CCCC Fourth Harbor Engineering Aluminum Alloy Sacrificial Anode Project site photo

Project overview

Start with the protected assets

Aluminum alloy sacrificial anodes and connection accessories are supplied for the metallic structures and installation points involved in this project. Anode arrangement, installation connections and potential testing are organized around the operating medium, installation position and site construction conditions.

Protected object
Project metallic structures and installation points
Environment
Operating medium, installation position and site construction conditions

Protection focus

Three key steps organized around site conditions

  1. 01

    Protected structures and installation positions

  2. 02

    Anode fixing and connection methods

  3. 03

    Protection potential testing and records

Technical route

From protection method to installation and testing

1

Aluminum alloy sacrificial anode protection

Confirm the approach against project metallic structures and installation points, operating medium, installation position and site construction conditions and the construction scope.

2

Fixing, welding or bracket installation

Confirm the approach against project metallic structures and installation points, operating medium, installation position and site construction conditions and the construction scope.

3

Installation connections and field testing

Confirm the approach against project metallic structures and installation points, operating medium, installation position and site construction conditions and the construction scope.

Project discussion

Start a similar project with the information available

Submit existing drawings or a purchasing list. If the product is still to be determined, describe the project assets and site environment first.

  • 01Protected assets and operating medium
  • 02Installation positions and site drawings
  • 03Protection scope and quantities