Nantong Port Lusi Operation Area West Basin Wharves No. 8–11, Contract Section B

Aluminum alloy sacrificial anodes and connection accessories are supplied for wharf steel piles, seawater facilities and underwater metallic structures. Anode arrangement, installation connections and potential testing are organized around seawater, tidal zones, splash zones and underwater construction conditions.

Nantong Port Lusi Operation Area West Basin Wharves No. 8–11, Contract Section B project site
Nantong Port Lusi Operation Area West Basin Wharves No. 8–11, Contract Section B site photo

Project overview

Start with the protected assets

Aluminum alloy sacrificial anodes and connection accessories are supplied for wharf steel piles, seawater facilities and underwater metallic structures. Anode arrangement, installation connections and potential testing are organized around seawater, tidal zones, splash zones and underwater construction conditions.

Protected object
Wharf steel piles, seawater facilities and underwater metallic structures
Environment
Seawater, tidal zones, splash zones and underwater construction conditions

Protection focus

Three key steps organized around site conditions

  1. 01

    Protected structures and installation positions

  2. 02

    Anode fixing and connection methods

  3. 03

    Protection potential testing and records

Technical route

From protection method to installation and testing

1

Aluminum alloy sacrificial anode protection

Confirm the approach against wharf steel piles, seawater facilities and underwater metallic structures, seawater, tidal zones, splash zones and underwater construction conditions and the construction scope.

2

Fixing, welding or bracket installation

Confirm the approach against wharf steel piles, seawater facilities and underwater metallic structures, seawater, tidal zones, splash zones and underwater construction conditions and the construction scope.

3

Installation connections and field testing

Confirm the approach against wharf steel piles, seawater facilities and underwater metallic structures, seawater, tidal zones, splash zones and underwater construction conditions and the construction scope.

Project discussion

Start a similar project with the information available

Submit existing drawings or a purchasing list. If the product is still to be determined, describe the project assets and site environment first.

  • 01Protected assets and operating medium
  • 02Installation positions and site drawings
  • 03Protection scope and quantities
  • 04Project stage and delivery region